Certificate Authority
(Links to Strategy 3: Technical Development and Innovation)
Project Sponsor: Michael Wallmannsberger
Staff Support: Campbell Gardiner
Project Status: Active
Project Description:
The Technical Policy Committee has identified the initiative of the creation of a NZ based Certification Authority (CA).
This project will scope the creation of a CA. Scoping outputs will include: key stakeholders, CA options, potential uptake, revenue models, cost of development, contributors to development.
Project Budget:
$50,000 has been budgeted for the Certificate Authority project in 2008/09.
Overall Progress Summary:
In 2007, Liverton was selected as CA scoping contractor. They completed their scoping report in December 2007, and subsequently wrote a 'strawman' document.
The strawman is intended to be discussed at a workshop, preferably held jointly by InternetNZ and the SSC.
Activities Planned for November / December 2008:
- Await completion of outstanding CA action points from 25 February 2008 and 5 May 2008 Tech-Pol meetings.
Project History:
October 2008:
- Followed up with the owner of the outstanding APs on a time-frame for getting these completed.
June 2008:
- Discussed next steps re: strawman workshop at Tech-Pol Committee. Full details at the following link:
- www.internetnz.net.nz/proceedings/ctte/tech/2008/techpol120608
February 2008:
- Received Liverton strawman document, depicting various establishment scenarios.
January 2008:
- Received Liverton's 2nd draft, incorporating feedback from the State Services Commission (Received 14/1/08).
- Provided Liverton with InternetNZ's technical feedback on the draft report.
December 2007:
- Received Liverton's scoping report (Draft 1).
- Tech-Pol Committee discussed the draft, identifying several areas that could be improved/expanded upon.
October - November 2007:
- Liverton scoping.
- Finalised Terms of Reference and contract with scoping contractor Liverton.
August - September 2007:
- Met with scoping contractor to flesh out the scoping requirements. They are to revise their original scoping proposal.
May - July 2007:
- Proposal received from potential scoping contractor in May reviewed.
April 2007:
- Initiated discussions with possible contractors for scoping exercise.
November 2006 - March 2007:
- Project 'On-Hold'.
August - October 2006:
-
Meeting with MSD to discuss their requirements for CA.
-
Ongoing liaison with State Services Commission.
- Discussions with DNC, NZRS and contractor to MSD re: their needs for certification.
June - July 2006:
-
Workshop of interested stakeholders (DNC, NZRS) held.
-
Overview paper of Certification Authorities produced and distributed.
-
M Wallmannsberger and C Jackson met with Peter Gutman.
-
Ongoing liaison with State Services Commission.
April 2006:
- Meetings and discussions with SSC personnel re: DNSSEC and related CA component.